Sirc Logo

Power & Energy

Substations, transformers and finding the fault before it finds you.

In generation and distribution, the cost of a wrong reading is measured in outage hours. The instruments here are diagnostic rather than indicative — they exist to find the fault that has not yet caused a failure.

Most of this work happens on live or recently isolated plant, which is why the certificate and the competence behind it matter as much as the instrument.

What this sector has to measure

Insulation and cable diagnostics

Polarisation index, dielectric discharge and step-voltage testing on cables, motors and transformer windings.

Earthing systems

Four-wire earth resistance testing on substation grids and lightning protection.

Power quality

Harmonics, imbalance and transient capture where sensitive loads are misbehaving for reasons nobody can see.

Predictive thermography

Surveys under representative load, ranked by severity, so shutdown work is planned rather than reactive.

Services this sector uses

Instruments for power & energy

−19%
Megger
MIT420Clearance

Insulation Tester 1 kV

Insulation Resistance & Battery

4.7(33)
In stock
BDT 72,500BDT 89,000