Sirc Logo

Power & Energy

Substations, transformers and finding the fault before it finds you.

In generation and distribution, the cost of a wrong reading is measured in outage hours. The instruments here are diagnostic rather than indicative — they exist to find the fault that has not yet caused a failure.

Most of this work happens on live or recently isolated plant, which is why the certificate and the competence behind it matter as much as the instrument.

What this sector has to measure

Insulation and cable diagnostics

Polarisation index, dielectric discharge and step-voltage testing on cables, motors and transformer windings.

Earthing systems

Four-wire earth resistance testing on substation grids and lightning protection.

Power quality

Harmonics, imbalance and transient capture where sensitive loads are misbehaving for reasons nobody can see.

Predictive thermography

Surveys under representative load, ranked by severity, so shutdown work is planned rather than reactive.

Services this sector uses

Instruments for power & energy

EnergyCommissioning
New

Solar Irradiance Meter

Handheld pyranometer for PV commissioning and panel performance verification.

BDT 86,500
19%
Insulation Resistance & BatteryTesting
Clearance

Insulation Tester 1 kV

Portable megohmmeter for routine motor, cable and panel insulation checks.

4.733 reviews
BDT 72,500BDT 89,000
10%
Electrical ToolsMeasurement
Trending

True-RMS Digital Multimeter

CAT IV 600 V multimeter with low-pass filter for variable speed drive measurement.

4.958 reviews
BDT 38,500BDT 43,000
12%
Fault TestingEarthing

Earth Resistance Tester 4-Wire

Fall-of-potential and soil resistivity testing for lightning protection and substation earth mats.

4.614 reviews
BDT 98,500BDT 112,000